Tender, tender analysis & construction
An extension of the building regs set, the RIBA stage 4 tender documentation contains full design detail and specification showing how every element of the building is put together.
This is where the big savings can potentially be found. For example one window supplier's standard details might look similar to another's, but they might specify a waterproofing method which is twice the price. Roof membranes, ventilation systems, internal doors, substructure design, internal finishes and fixtures. These are all fundamentally complex elements of a building's fabric all interacting with one another.
Our tender / construction service includes:
Production of all general arrangement drawings; plans, sections, elevations
Production of construction specification
Production of finishes specification
Production of 1:5 construction details
Tender analysis
Tenderer's query review
Recommendations
Preparation of Contractors Proposals (if required for Design & Build contractors)